{"id":3130,"date":"2018-06-23T17:19:45","date_gmt":"2018-06-24T00:19:45","guid":{"rendered":"http:\/\/celloexpressions.com\/photography\/?p=3130"},"modified":"2018-06-23T17:19:45","modified_gmt":"2018-06-24T00:19:45","slug":"washington-county-law-enforcement-center-seismic-upgrade","status":"publish","type":"post","link":"https:\/\/celloexpressions.com\/photography\/2018\/06\/washington-county-law-enforcement-center-seismic-upgrade\/","title":{"rendered":"Washington County Law Enforcement Center Seismic Upgrade"},"content":{"rendered":"<p>Washington County&#8217;s Law Enforcement Center in Hillsboro, OR was seismically upgraded to improve its ability to remain operational following a major earthquake. The upgrade added six external steel cross-braced frames, which supplement the existing reinforced concrete moment frame built in 1998. I provided construction administration services for the structural scope with KPFF, for SERA Architects and JE Dunn Construction.This is the first of several\u00a0<a href=\"https:\/\/www.co.washington.or.us\/cao\/seismic-upgrades-for-washington-county-buildings.cfm\">seismic upgrade projects planned by Washington County<\/a>.<\/p>\n<p><a href=\"http:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_53_49_Pro.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-3131\" src=\"http:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_53_49_Pro-1024x576.jpg\" alt=\"\" width=\"660\" height=\"371\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_53_49_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_53_49_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_53_49_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_53_49_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a> <a href=\"http:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_56_41_Pro.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-3133\" src=\"http:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_56_41_Pro-1024x576.jpg\" alt=\"\" width=\"660\" height=\"371\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_56_41_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_56_41_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_56_41_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_56_41_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Washington County&#8217;s Law Enforcement Center in Hillsboro, OR was seismically upgraded to improve its ability to remain operational following a major earthquake. The upgrade added six external steel cross-braced frames, which supplement the existing reinforced concrete moment frame built in 1998. I provided construction administration services for the structural scope with KPFF, for SERA Architects and JE Dunn Construction.This is the first of several\u00a0<a href=\"https:\/\/www.co.washington.or.us\/cao\/seismic-upgrades-for-washington-county-buildings.cfm\">seismic upgrade projects planned by Washington County<\/a>.<\/p>\n<p><a href=\"http:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_53_49_Pro.jpg\"><\/a> <a href=\"http:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180621_09_56_41_Pro.jpg\"><\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"author":1,"featured_media":3132,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"image","meta":{"footnotes":""},"categories":[4],"tags":[34,33],"class_list":["post-3130","post","type-post","status-publish","format-image","has-post-thumbnail","hentry","category-architecture","tag-kpff","tag-retrofit","post_format-post-format-image"],"_links":{"self":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/3130","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/comments?post=3130"}],"version-history":[{"count":1,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/3130\/revisions"}],"predecessor-version":[{"id":3134,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/3130\/revisions\/3134"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/media\/3132"}],"wp:attachment":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/media?parent=3130"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/categories?post=3130"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/tags?post=3130"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}