{"id":3174,"date":"2018-12-30T14:31:34","date_gmt":"2018-12-30T22:31:34","guid":{"rendered":"https:\/\/celloexpressions.com\/photography\/?p=3174"},"modified":"2021-10-16T19:11:42","modified_gmt":"2021-10-17T02:11:42","slug":"5-mlk-construction-2018","status":"publish","type":"post","link":"https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/","title":{"rendered":"5 MLK Construction, 2018"},"content":{"rendered":"<p>The first year of construction on the new <a href=\"http:\/\/www.nextportland.com\/2017\/06\/20\/5-mlk-approved\/\">5 MLK mixed-use development<\/a> in Portland, OR is now complete. Demolition of the five existing structures, excavation for the three-story basement, construction of reinforced concrete foundations, and the first few elevated levels represent a substantial volume of work that is not visible to most. To the average driver on Burnside or MLK, little work is visible other than the 300-plus-foot-tall tower crane. With the construction of the first above-grade floor slab at the end of the year, the stage has been set for this highly-visible tower to rise as a complement to the controversial Yard building across Burnside.<\/p>\n<p>Here are some of my favorite images from the first year of construction:<\/p>\n<div id='gallery-1' class='gallery galleryid-3174 gallery-columns-1 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180530_15_16_54_rich\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180530_15_16_54_Rich-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3301\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180530_15_16_54_Rich-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180530_15_16_54_Rich-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180530_15_16_54_Rich-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180530_15_16_54_Rich-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3301'>\n\t\t\t\tFormwork and rebar for the tower crane footing.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180609_13_22_35_rich-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180609_13_22_35_Rich-2-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3302\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180609_13_22_35_Rich-2-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180609_13_22_35_Rich-2-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180609_13_22_35_Rich-2-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180609_13_22_35_Rich-2-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3302'>\n\t\t\t\tTower crane erection at 5 MLK, with the Towne Storage building in the foreground.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180613_14_41_16_rich\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180613_14_41_16_Rich-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3304\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180613_14_41_16_Rich-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180613_14_41_16_Rich-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180613_14_41_16_Rich-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180613_14_41_16_Rich-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3304'>\n\t\t\t\tFormwork and rebar for the first shear wall and column footings, and grade beams.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180711_14_37_04_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180711_14_37_04_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3306\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180711_14_37_04_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180711_14_37_04_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180711_14_37_04_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180711_14_37_04_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3306'>\n\t\t\t\tFormwork and rebar for the elevator core are installed as excavation progresses on the west portion of the site.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180723_15_58_26_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180723_15_58_26_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3308\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180723_15_58_26_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180723_15_58_26_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180723_15_58_26_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180723_15_58_26_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3308'>\n\t\t\t\tShear wall boundary element rebar cage for an elevator core wall at 5 MLK.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180730_14_08_11_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180730_14_08_11_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3310\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180730_14_08_11_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180730_14_08_11_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180730_14_08_11_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180730_14_08_11_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3310'>\n\t\t\t\tRebar for the first two levels of below-grade parking of the elevator core.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180730_14_11_33_pro-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"660\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180730_14_11_33_Pro-2-1024x1024.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3312\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180730_14_11_33_Pro-2-1024x1024.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180730_14_11_33_Pro-2-150x150.jpg 150w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180730_14_11_33_Pro-2-300x300.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180730_14_11_33_Pro-2-768x768.jpg 768w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3312'>\n\t\t\t\tView inside a shear wall boundary element prepared to be filled with concrete at the core walls at the base of 5 MLK.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180808_14_30_36_rich\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180808_14_30_36_Rich-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3315\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180808_14_30_36_Rich-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180808_14_30_36_Rich-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180808_14_30_36_Rich-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180808_14_30_36_Rich-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3315'>\n\t\t\t\tColumn footings are poured at the base of the excavation.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180808_15_30_33_rich\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180808_15_30_33_Rich-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3317\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180808_15_30_33_Rich-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180808_15_30_33_Rich-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180808_15_30_33_Rich-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180808_15_30_33_Rich-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3317'>\n\t\t\t\tView from the Burnside Bridge, as column footings are poured at the bottom of the excavation, below the third below-grade parking level.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180820_14_33_31_rich\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180820_14_33_31_Rich-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3319\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180820_14_33_31_Rich-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180820_14_33_31_Rich-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180820_14_33_31_Rich-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180820_14_33_31_Rich-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3319'>\n\t\t\t\tThe first two levels of elevator core walls with concrete poured.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180820_15_01_04_rich\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180820_15_01_04_Rich-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3321\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180820_15_01_04_Rich-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180820_15_01_04_Rich-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180820_15_01_04_Rich-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180820_15_01_04_Rich-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3321'>\n\t\t\t\tElevator core walls in the basement of 5 MLK with the yard building rising in the distance.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180925_13_43_01_rich\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180925_13_43_01_Rich-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3323\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180925_13_43_01_Rich-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180925_13_43_01_Rich-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180925_13_43_01_Rich-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180925_13_43_01_Rich-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3323'>\n\t\t\t\tFormwork for the first elevated slab, lower level 2, and rebar for the core wall extension up to level 1.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20180925_14_45_54_rich\/'><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180925_14_45_54_Rich-e1545604575371-576x1024.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3378\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180925_14_45_54_Rich-e1545604575371-576x1024.jpg 576w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180925_14_45_54_Rich-e1545604575371-169x300.jpg 169w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20180925_14_45_54_Rich-e1545604575371-768x1364.jpg 768w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3378'>\n\t\t\t\tView of the 5 MLK elevator core from the parking ramp at lower level 3 up to level 1, with the Yard building rising across the Burnside Bridge.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20181002_14_33_24_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181002_14_33_24_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3326\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181002_14_33_24_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181002_14_33_24_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181002_14_33_24_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181002_14_33_24_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3326'>\n\t\t\t\tView from the Burnside Bridge, as post-tensioning cables are installed for the first elevated slab.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20181002_14_38_48_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181002_14_38_48_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3328\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181002_14_38_48_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181002_14_38_48_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181002_14_38_48_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181002_14_38_48_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3328'>\n\t\t\t\tElevator core reinforcing and lower level 2 slab cables.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20181005_15_04_09_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181005_15_04_09_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3330\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181005_15_04_09_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181005_15_04_09_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181005_15_04_09_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181005_15_04_09_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3330'>\n\t\t\t\tConcrete is placed in the elevator core up to level 1, as the lower level 2 slab is prepared.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20181010_14_23_05_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_14_23_05_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3332\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_14_23_05_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_14_23_05_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_14_23_05_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_14_23_05_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3332'>\n\t\t\t\tView from the Burnside Bridge, as columns are poured between lower level 2 and lower level 1.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20181010_14_41_41_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_14_41_41_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3334\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_14_41_41_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_14_41_41_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_14_41_41_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_14_41_41_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3334'>\n\t\t\t\tVertical work approaches grade level after the first elevated slab pour.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20181010_15_31_23_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_15_31_23_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3336\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_15_31_23_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_15_31_23_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_15_31_23_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_15_31_23_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3336'>\n\t\t\t\tThe elevator core is poured up to level 1 as the parking ramp slabs prepare to rise to the lower grade level along SE 3rd Ave.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20181031_14_46_35_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181031_14_46_35_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3338\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181031_14_46_35_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181031_14_46_35_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181031_14_46_35_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181031_14_46_35_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3338'>\n\t\t\t\tPost-tensioning cables, rebar, and electrical conduit are prepared in the lower level 1 slab, as work begins on the elevator core above level 1.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/wp_20181119_13_08_07_pro\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181119_13_08_07_Pro-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3343\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181119_13_08_07_Pro-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181119_13_08_07_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181119_13_08_07_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181119_13_08_07_Pro-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3343'>\n\t\t\t\tFormwork and rebar installation at the southeast corner of level 1.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/img_20181227_131443\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_131443-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3385\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_131443-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_131443-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_131443-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_131443-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3385'>\n\t\t\t\tView of lower level 1, level 1, and level 2 from the Burnside Bridge in late December, 2018.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/img_20181227_132130\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_132130-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3386\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_132130-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_132130-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_132130-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_132130-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3386'>\n\t\t\t\tFormwork for level 2 encloses a double-height retail space at the corner of SE Ankeny and 3rd.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/mvimg_20181227_132535\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_132535-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3387\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_132535-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_132535-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_132535-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_132535-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3387'>\n\t\t\t\tParking ramp at lower level 3, where the basement walls are prepared for shotcrete installation.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/img_20181227_133954\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_133954-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3388\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_133954-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_133954-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_133954-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_133954-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3388'>\n\t\t\t\tCompleted concrete work inside the PGE Utility Vault.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/img_20181227_135034\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135034-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3389\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135034-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135034-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135034-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135034-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3389'>\n\t\t\t\tIntersection of parking ramp slabs with a stair shaft and the elevator core at lower level 2.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/img_20181227_135732\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135732-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3390\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135732-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135732-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135732-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135732-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3390'>\n\t\t\t\tFormwork for level 3 is installed above level 2.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/img_20181227_135737\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135737-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3391\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135737-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135737-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135737-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_135737-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3391'>\n\t\t\t\tThe tower crane lifts a section of formwork for the level 3 slab off of the completed level 2 deck.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/mvimg_20181227_135946\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_135946-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3392\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_135946-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_135946-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_135946-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_135946-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3392'>\n\t\t\t\tColumns rise from levels 2 to 3, framing the Yard building.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/mvimg_20181227_140044\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_140044-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3393\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_140044-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_140044-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_140044-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/MVIMG_20181227_140044-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3393'>\n\t\t\t\tPreparation for the western level 2 slab pour with a view of the Towne Storage building and downtown Portland as sunset approaches.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/img_20181227_141530\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_141530-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3394\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_141530-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_141530-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_141530-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_141530-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3394'>\n\t\t\t\tView to the six-story buildings surrounding 5 MLK from the level 2 deck.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/img_20181227_144013\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"371\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_144013-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-3395\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_144013-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_144013-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_144013-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/12\/IMG_20181227_144013-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-3395'>\n\t\t\t\tView into the double-height retail space at the corner of SE Ankeny and 3rd from a future mechanical room at level 1.\n\t\t\t\t<\/figcaption><\/figure>\n\t\t<\/div>\n\n\n\n<div style=\"height:1px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<aside class=\"wp-block-group has-light-gray-color has-black-background-color has-text-color has-background\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h1 class=\"has-text-align-center wp-block-heading\">5 MLK Construction Series<\/h1>\n\n\n\n<div style=\"height:24px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-query is-layout-flow wp-block-query-is-layout-flow\"><ul class=\"wp-block-post-template is-layout-flow wp-block-post-template-is-layout-flow\"><li class=\"wp-block-post post-2810 post type-post status-publish format-image has-post-thumbnail hentry category-architecture category-construction tag-5-mlk tag-kpff tag-portland post_format-post-format-image\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2017\/12\/fishels-furniture-warehouse-basement\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2017\/12\/WP_20171222_10_27_52_Rich-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Fishels Furniture Warehouse Basement\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2017\/12\/WP_20171222_10_27_52_Rich-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2017\/12\/WP_20171222_10_27_52_Rich-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2017\/12\/WP_20171222_10_27_52_Rich-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2017\/12\/WP_20171222_10_27_52_Rich-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure><\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2017\/12\/fishels-furniture-warehouse-basement\/\" target=\"_self\" >Fishels Furniture Warehouse Basement<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2017-12-31T16:35:06-08:00\">December 31, 2017<\/time><\/div><\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3109 post type-post status-publish format-image has-post-thumbnail hentry category-construction tag-5-mlk tag-portland post_format-post-format-image\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2018\/04\/fishels-furniture-demolition\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180207_15_05_02_Rich-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Fishels Furniture Demolition\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180207_15_05_02_Rich-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180207_15_05_02_Rich-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180207_15_05_02_Rich-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/06\/WP_20180207_15_05_02_Rich-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure><\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2018\/04\/fishels-furniture-demolition\/\" target=\"_self\" >Fishels Furniture Demolition<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2018-04-10T17:45:18-07:00\">April 10, 2018<\/time><\/div><\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3174 post type-post status-publish format-gallery has-post-thumbnail hentry category-construction tag-5-mlk tag-kpff tag-portland post_format-post-format-gallery\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_15_31_23_Pro-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"5 MLK Construction, 2018\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_15_31_23_Pro-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_15_31_23_Pro-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_15_31_23_Pro-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2018\/10\/WP_20181010_15_31_23_Pro-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure><\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/\" target=\"_self\" >5 MLK Construction, 2018<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2018-12-30T14:31:34-08:00\">December 30, 2018<\/time><\/div><\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3453 post type-post status-publish format-gallery has-post-thumbnail hentry category-construction tag-5-mlk tag-kpff tag-portland post_format-post-format-gallery\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2019\/12\/5-mlk-construction-2019\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2019\/12\/IMG_20190823_163329-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"5 MLK Construction, 2019\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2019\/12\/IMG_20190823_163329-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2019\/12\/IMG_20190823_163329-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2019\/12\/IMG_20190823_163329-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2019\/12\/IMG_20190823_163329-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2019\/12\/IMG_20190823_163329-1536x864.jpg 1536w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2019\/12\/IMG_20190823_163329-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure><\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2019\/12\/5-mlk-construction-2019\/\" target=\"_self\" >5 MLK Construction, 2019<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2019-12-30T16:34:00-08:00\">December 30, 2019<\/time><\/div><\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-3899 post type-post status-publish format-gallery has-post-thumbnail hentry category-architecture category-construction tag-5-mlk tag-kpff tag-portland post_format-post-format-gallery\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2020\/08\/5-mlk-2020\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2020\/10\/IMG_20200708_134508-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"5 MLK, 2020\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2020\/10\/IMG_20200708_134508-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2020\/10\/IMG_20200708_134508-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2020\/10\/IMG_20200708_134508-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2020\/10\/IMG_20200708_134508-768x432.jpg 768w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2020\/10\/IMG_20200708_134508-1536x864.jpg 1536w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2020\/10\/IMG_20200708_134508-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure><\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2020\/08\/5-mlk-2020\/\" target=\"_self\" >5 MLK, 2020<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2020-08-01T12:53:04-07:00\">August 1, 2020<\/time><\/div><\/div>\n<\/div>\n\n<\/li><\/ul><\/div>\n<\/div><\/aside>\n","protected":false},"excerpt":{"rendered":"<p>2020 brought, among other things, the completion of the 5 MLK building at the Burnside Bridgehead. While <a href=\"https:\/\/celloexpressions.com\/blog\/burnside-bridge-replacement\/\">Multnomah County contemplates replacing the Burnside Bridge<\/a>, 5 MLK offers a new approach to massing and fa\u00e7ade articulation for Portland. Small terraces on each office level feature extensive landscaping, creating a micro-ecosystem on top of the building. The unique tower mass offers numerous opportunities for corner views in every direction. And the rooftop amenity space overlooks the river and the city. The completed project stands as the tallest building in Southeast Portland and brings further energy to the bridgehead area as it expands south to integrate with the Central Eastside Industrial District.<\/p>\n<\/p>\n<p>See also <a href=\"https:\/\/chatterbox.typepad.com\/portlandarchitecture\/2020\/12\/visiting-5-mlk-.html\">this architectural review<\/a> and <a href=\"https:\/\/www.grecstudio.com\/projects\/5-se-mlk-blvd\">GREC Architects<\/a>.<\/p>\n<h1 class=\"has-text-align-center wp-block-heading\">5 MLK Construction Series<\/h1>\n<p> <a href=\"https:\/\/celloexpressions.com\/photography\/2017\/12\/fishels-furniture-warehouse-basement\/\" target=\"_self\" ><\/a> <\/p>\n<h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2017\/12\/fishels-furniture-warehouse-basement\/\" target=\"_self\" >Fishels Furniture Warehouse Basement<\/a><\/h2>\n<p> December 31, 2017 <a href=\"https:\/\/celloexpressions.com\/photography\/2018\/04\/fishels-furniture-demolition\/\" target=\"_self\" ><\/a> <\/p>\n<h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2018\/04\/fishels-furniture-demolition\/\" target=\"_self\" >Fishels Furniture Demolition<\/a><\/h2>\n<p> April 10, 2018 <a href=\"https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/\" target=\"_self\" ><\/a>&hellip;<\/p>\n<div><a class=\"excerpt-more button\" href=\"https:\/\/celloexpressions.com\/photography\/2018\/12\/5-mlk-construction-2018\/\">Read more <span class=\"screen-reader-text\">5 MLK Construction, 2018 <\/span><span class=\"meta-nav\" aria-hidden=\"true\"> &rarr;<\/span><\/a><\/div>\n","protected":false},"author":1,"featured_media":3336,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[6],"tags":[36,34,32],"class_list":["post-3174","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-construction","tag-5-mlk","tag-kpff","tag-portland","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/3174","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/comments?post=3174"}],"version-history":[{"count":5,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/3174\/revisions"}],"predecessor-version":[{"id":4858,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/3174\/revisions\/4858"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/media\/3336"}],"wp:attachment":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/media?parent=3174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/categories?post=3174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/tags?post=3174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}