{"id":376,"date":"2015-08-07T21:51:56","date_gmt":"2015-08-08T04:51:56","guid":{"rendered":"http:\/\/celloexpressions.com\/photography\/?p=376"},"modified":"2015-09-05T19:33:42","modified_gmt":"2015-09-06T02:33:42","slug":"usc-village-construction-week-of-8-3-2014","status":"publish","type":"post","link":"https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/","title":{"rendered":"USC Village Construction &#8211; Week of 8-3-2014"},"content":{"rendered":"<p>This week, the first precast concrete and brick facade panels were installed on Building 4. The panels are manufactured from clay brick, architectural concrete, and structural concrete at an offsite facility and can be erected much more quickly than hand-set brick over framed and sheathed walls. This was a test installation for architectural review, and the rest of the panels will begin to be installed in about a month.<\/p>\n<div id='gallery-1' class='gallery galleryid-376 gallery-columns-1 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_002\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_002-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-377\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_002-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_002-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-377'>\n\t\t\t\tStacks for four manholes connect to a precast grease interceptor that has been set North of Building 9.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_004\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_004-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-378\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_004-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_004-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-378'>\n\t\t\t\tFine grading at Building 1 in preparation for the slab on grade concrete.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_008\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_008-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-379\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_008-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_008-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-379'>\n\t\t\t\tThe methane barrier under the slab on grade is installed at Building 1.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_010\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_010-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-380\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_010-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_010-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-380'>\n\t\t\t\tBuilding 9 has risen to level 3 on the North side facing Building 1.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_033\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_033-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-381\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_033-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_033-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-381'>\n\t\t\t\tUnderground work continues at the Building 8 electrical rooms.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_034\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_034-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-382\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_034-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_034-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-382'>\n\t\t\t\tFine grading in the second slab on grade pour area at Building 8.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_036\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_036-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-383\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_036-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_036-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-383'>\n\t\t\t\tFuture data room in Building 8 level 1.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_043\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_043-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-384\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_043-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_043-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-384'>\n\t\t\t\tFine grading in Building 7 in preparation for its slab on grade.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_044\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_044-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-385\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_044-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_044-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-385'>\n\t\t\t\tElevators in the Building 7 lobby.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_045\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_045-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-386\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_045-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_045-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-386'>\n\t\t\t\tRebar and edge forming in place for the first Building 7 slab on grade pour.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_059\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_059-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-387\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_059-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_059-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-387'>\n\t\t\t\tShoring in Building 6 for level 3.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_065\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_065-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-388\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_065-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_065-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-388'>\n\t\t\t\tShoring for level 3 in Building 6, along Jefferson Boulevard.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_066\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"389\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_066-1024x604.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-389\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_066-1024x604.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_066-300x177.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-389'>\n\t\t\t\tConcrete had to be chipped out at this stair shaft in Building 6 due to incorrectly-installed rebar. It will be re-poured shortly.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_070\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_070-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-390\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_070-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_070-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-390'>\n\t\t\t\tView of Jefferson Boulevard from Building 6 level 2.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_080\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_080-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_080-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_080-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_082\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_082-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-392\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_082-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_082-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-392'>\n\t\t\t\tA bridge at level 3 spans the gap between the East and West courtyards in Building 6.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_087\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_087-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-393\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_087-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_087-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-393'>\n\t\t\t\tCloser view of chipped concrete for a rebar repair at a Building 6 stairwell.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_091-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_091-2-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-394\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_091-2-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_091-2-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-394'>\n\t\t\t\tCentral plaza from Building 6 level 2.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_099\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_099-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-395\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_099-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_099-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-395'>\n\t\t\t\tBuilding 4 south facade from Building 6 level 2.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150803_101\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_101-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-396\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_101-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150803_101-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-396'>\n\t\t\t\tBuilding 4 south facade, where the first precast brick panels will be installed tomorrow.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150804_003\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150804_003-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-397\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150804_003-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150804_003-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-397'>\n\t\t\t\tThe old Fire Station No. 15 building has been encased in scaffolding and a tent while the exterior pain, which contains asbestos, is removed.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_001\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_001-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-398\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_001-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_001-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-398'>\n\t\t\t\tBuildings 6 and 4 from across Jefferson Boulevard early in the morning.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_015\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_015-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-399\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_015-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_015-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-399'>\n\t\t\t\tA crane lifts the first precast brick panel of the USC Village project into place at the residential entrance to Building 4.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_022\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"395\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_022-1024x613.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-400\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_022-1024x613.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_022-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-400'>\n\t\t\t\tA closer look at the first brick panel.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_031\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_031-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-401\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_031-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_031-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-401'>\n\t\t\t\tMeanwhile, concrete is placed on Building 6 level 3.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_041\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_041-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-402\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_041-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_041-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-402'>\n\t\t\t\tBuilding 6 concrete pump with Building 4 and its tower crane in the background.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_042\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_042-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-403\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_042-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_042-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-403'>\n\t\t\t\tThe tower crane prepares to lift a shear wall form on Building 6 next to the courtyard.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_046\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_046-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-404\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_046-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_046-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-404'>\n\t\t\t\tFinishers begin work on Building 6 level 3&#8217;s freshly poured concrete.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_047\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_047-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-405\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_047-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_047-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-405'>\n\t\t\t\tCorner of Building 6 level 3, looking toward campus.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_049\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_049-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-406\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_049-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_049-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-406'>\n\t\t\t\tThe old Fire Station No. 3 in its tent and Building 8, where level 2 is beginning to be formed.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_055\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_055-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-407\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_055-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_055-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-407'>\n\t\t\t\tThe central plaza and Building 9 from Building 6 level 3.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_056\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_056-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-408\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_056-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_056-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-408'>\n\t\t\t\tBuilding 4, now formed through the roof, from Building 6 level 3.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_058\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_058-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-409\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_058-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_058-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-409'>\n\t\t\t\tThe first precast panel is welded into place, against steel embeds in the concrete shear wall.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_060\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_060-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-410\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_060-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_060-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-410'>\n\t\t\t\tView of another precast panel sitting face down on a flatbed truck.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_061\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_061-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-411\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_061-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_061-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-411'>\n\t\t\t\tEnd view of a precast panel showing the thickness of the &#8220;thin brick&#8221; face. The brick is normal clay brick, in a tile thickness. It&#8217;s laid into a mold by hand, then structural concrete is poured behind it to form the wall panel.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_064\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_064-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-412\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_064-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_064-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-412'>\n\t\t\t\tHalf bricks are used at the edge of the panels to provide articulation at the joints between panels.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_073\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_073-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-413\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_073-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_073-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-413'>\n\t\t\t\tFour precast arch panels wait to be unloaded from the flatbed trucks that shipped them from the plant in Mexico.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_076\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_076-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-414\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_076-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_076-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-414'>\n\t\t\t\tBuilding 6 concrete pour from Building 4.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_079\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_079-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-415\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_079-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_079-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-415'>\n\t\t\t\tView of the first precast panel from along the southern face of Building 4.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_080\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_080-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-416\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_080-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_080-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-416'>\n\t\t\t\tInstallation of the first precast panel is complete.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_089\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_089-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-417\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_089-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_089-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-417'>\n\t\t\t\tA precast arch panel is lifted into place.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_091\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"454\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_091-1024x704.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-418\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_091-1024x704.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_091-300x206.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-418'>\n\t\t\t\tThe third single arch panel is lifted into place. Each arch panel is 12 feet wide. Additional precast pieces will form capitals connecting to each of the cast-in-place round columns beneath the arches.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_093\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_093-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-419\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_093-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_093-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-419'>\n\t\t\t\tArched opening formed by the first two precast panels at the Building 4 residential lobby entrance.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_097\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_097-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-420\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_097-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_097-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-420'>\n\t\t\t\tLooking out through the arches from the Building 4 residential lobby.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_107\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_107-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-421\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_107-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_107-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-421'>\n\t\t\t\tThe metal stud line behind the arches will be the top of the storefront window glazing.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_108\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"436\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_108-1024x676.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-422\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_108-1024x676.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_108-300x198.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-422'>\n\t\t\t\tA closer look at the arch shape over the Building 4 residential lobby entrance.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_115\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_115-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-423\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_115-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_115-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-423'>\n\t\t\t\tAcross from the kitchen area in Building 4, the site office for Coreslab Structures is the on-site base for the precast panel team.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_123\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_123-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-424\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_123-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_123-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-424'>\n\t\t\t\tFootings and wall rebar for the Building 4 dining hall.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_125\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_125-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-425\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_125-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_125-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-425'>\n\t\t\t\tColumn and wall formwork is going up for the Dining Hall.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_127\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_127-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-426\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_127-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_127-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-426'>\n\t\t\t\tBack of the precast arches from the Building 4 residential lobby.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_134\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_134-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-427\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_134-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_134-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-427'>\n\t\t\t\tFuture food court in Building 4.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_138\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_138-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-428\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_138-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_138-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-428'>\n\t\t\t\tSteel embeds to be placed in the structural concrete.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_144\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_144-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-429\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_144-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_144-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-429'>\n\t\t\t\tFine grading continues at Building 7.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_146\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_146-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-430\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_146-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_146-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-430'>\n\t\t\t\tBuilding 7 is ready for its first slab on grade pour.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_148\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_148-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-431\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_148-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_148-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-431'>\n\t\t\t\tRebar and edge forming at a step in the Building 7 ground floor slab.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_154\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_154-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-432\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_154-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_154-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-432'>\n\t\t\t\tFine grading over the methane barrier at the Building 7 electrical rooms.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_157\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_157-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-433\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_157-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_157-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-433'>\n\t\t\t\tBuilding 4 from the central plaza.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_159\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_159-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-434\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_159-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_159-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-434'>\n\t\t\t\tPrecast panel installation continues.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_177\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_177-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-435\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_177-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_177-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-435'>\n\t\t\t\tA closer look at the first few precast brick panels.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_178\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_178-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-436\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_178-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_178-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-436'>\n\t\t\t\tThe arched opening at the Building 4 residential lobby entrance.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_181\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_181-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-437\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_181-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_181-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-437'>\n\t\t\t\tThese precast arch panels will be repeated around most of Building 4 at level 1, in front of storefront glazing.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_184\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_184-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-438\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_184-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_184-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-438'>\n\t\t\t\tLooking up along the newly-installed facade.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150806_185\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_185-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-439\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_185-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150806_185-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-439'>\n\t\t\t\tThe first batch of panels is complete; second-floor panels are next, tomorrow.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_002\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_002-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-440\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_002-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_002-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-440'>\n\t\t\t\tA precast brick panel is lifted from its truck.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_012\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_012-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-441\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_012-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_012-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-441'>\n\t\t\t\tThe first second-floor panel is lifted into place. This is the most intricate precast panel on the project.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_020\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_020-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-442\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_020-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_020-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-442'>\n\t\t\t\tOne side of the Building 4 dining hall is now enclosed.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_029\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_029-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-443\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_029-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_029-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-443'>\n\t\t\t\tLooking out the tracery in the intricate panels on Building 4 level 2.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_033\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_033-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-444\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_033-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_033-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-444'>\n\t\t\t\tDetail of the triple-arch tracery.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_038\/'><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"1024\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_038-612x1024.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-445\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_038-612x1024.jpg 612w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_038-179x300.jpg 179w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_038.jpg 1952w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-445'>\n\t\t\t\tA single window. The arches will frame the view out from level 2 in this building, the future honors college.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_042\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_042-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-446\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_042-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_042-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-446'>\n\t\t\t\tA row of intricate facade panels from Building 4 level 2.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_048\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_048-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-447\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_048-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_048-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-447'>\n\t\t\t\tEach bedroom along this stretch will have 1-2 of these windows.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_051\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"395\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_051-1024x613.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-448\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_051-1024x613.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_051-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-448'>\n\t\t\t\tBuilding 4 level 2 corridor.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_057\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_057-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-449\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_057-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_057-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-449'>\n\t\t\t\tBuilding 4 upper courtyard, with the roof level now formed up.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_061\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_061-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-450\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_061-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_061-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-450'>\n\t\t\t\tCantilever slab above a future storefront at a study room that opens to the upper courtyard in Building 4.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_069\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_069-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-451\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_069-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_069-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-451'>\n\t\t\t\tLooking out toward the Building 9 pavilion from next to the future tower at Building 4.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_073\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_073-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-452\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_073-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_073-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-452'>\n\t\t\t\tView of the central plaza from Building 4 level 2.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_077\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_077-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-453\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_077-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_077-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-453'>\n\t\t\t\tThe Building 4 roof is ready to be poured early next week.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_080\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_080-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-454\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_080-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_080-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-454'>\n\t\t\t\tBuilding 4 across the upper courtyard at the roof, looking toward the Building 9 tower crane.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_083\/'><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"1024\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_083-612x1024.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-455\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_083-612x1024.jpg 612w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_083-179x300.jpg 179w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_083.jpg 1952w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-455'>\n\t\t\t\tTwo levels of precast brick panels out of five.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_086\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_086-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-456\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_086-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_086-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-456'>\n\t\t\t\tMethane barrier is installed at the second area of Building 7.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_088\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_088-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-457\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_088-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_088-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-457'>\n\t\t\t\tFreshly-poured slab on grade in Building 7.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_099\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_099-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-458\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_099-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_099-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-458'>\n\t\t\t\tBuilding 4 from the central plaza.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_104\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_104-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-459\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_104-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_104-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-459'>\n\t\t\t\tBuilding 4 through the level 2 shoring at Building 8.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_107\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_107-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-460\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_107-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_107-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-460'>\n\t\t\t\tBuilding 8 is almost ready for its second section of slab on grade.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_108\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_108-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-461\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_108-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_108-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-461'>\n\t\t\t\tBuilding 8 shear wall.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_110\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_110-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-462\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_110-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_110-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-462'>\n\t\t\t\tParking pavilion at the future Trader Joe&#8217;s storefront in Building 9.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_112\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_112-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-463\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_112-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_112-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-463'>\n\t\t\t\tFuture Trader Joe&#8217;s in Building 9.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_116\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_116-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-464\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_116-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_116-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-464'>\n\t\t\t\tThe Building 9 tower crane currently penetrates the underground parking and first and second floor slabs.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_129\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_129-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-465\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_129-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_129-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-465'>\n\t\t\t\tTrenching at the perimeter of Building 9 in preparation for construction of corbels to support precast brick panels.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_133\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_133-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-466\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_133-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_133-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-466'>\n\t\t\t\tUnderground utility work north of Building 9.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_135\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_135-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-467\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_135-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_135-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-467'>\n\t\t\t\tThe DWP yard in Building 1 will handle most of the utility connections for the entire village.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_144\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_144-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-468\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_144-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_144-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-468'>\n\t\t\t\tEdge forming and rebar are in place for the first slab on grade pour at Building 1.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_147\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_147-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-469\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_147-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_147-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-469'>\n\t\t\t\tBuilding 1 prepares to rise across from the new Fire Station No. 15 on the site of the former Wendy&#8217;s fast food restaurant.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_154\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_154-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-470\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_154-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_154-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-470'>\n\t\t\t\tArcade at a future retail space in Building 4.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_159\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_159-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-471\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_159-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_159-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-471'>\n\t\t\t\tReshores in the tall future retail space along Jefferson Boulevard in Building 6.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_161\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_161-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-472\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_161-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_161-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-472'>\n\t\t\t\tThe initial precast panel installation from the southern corner of the site.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_162\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_162-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-473\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_162-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_162-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-473'>\n\t\t\t\tPrecast facade progress from Building 6 level 2.\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/celloexpressions.com\/photography\/2015\/08\/usc-village-construction-week-of-8-3-2014\/wp_20150807_170\/'><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"394\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_170-1024x612.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-474\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_170-1024x612.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2015\/09\/WP_20150807_170-300x179.jpg 300w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-474'>\n\t\t\t\tInitial precast brick panel installation.\n\t\t\t\t<\/figcaption><\/figure>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>This week, the first precast concrete and brick facade panels were installed on Building 4. The panels are manufactured from clay brick, architectural concrete, and structural concrete at an offsite facility and can be erected much more quickly than hand-set brick over framed and sheathed walls. This was a test installation for architectural review, and the rest of the panels will begin to be installed in about a month.<\/p>\n","protected":false},"author":1,"featured_media":433,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[6],"tags":[9,10],"class_list":["post-376","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-construction","tag-usc","tag-usc-village","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/comments?post=376"}],"version-history":[{"count":1,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/376\/revisions"}],"predecessor-version":[{"id":475,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/376\/revisions\/475"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/media\/433"}],"wp:attachment":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/media?parent=376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/categories?post=376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/tags?post=376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}