{"id":6744,"date":"2024-12-31T17:13:00","date_gmt":"2025-01-01T01:13:00","guid":{"rendered":"https:\/\/celloexpressions.com\/photography\/?p=6744"},"modified":"2024-12-31T17:13:00","modified_gmt":"2025-01-01T01:13:00","slug":"sherwood-highway-99w-pedestrian-bridge-construction-2024","status":"publish","type":"post","link":"https:\/\/celloexpressions.com\/photography\/2024\/12\/sherwood-highway-99w-pedestrian-bridge-construction-2024\/","title":{"rendered":"Sherwood Highway 99W Pedestrian Bridge Construction, 2024"},"content":{"rendered":"\n<p>The City of Sherwood broke ground on its bicycle and pedestrian crossing of Highway 99W in March 2024. Construction this year saw erection of three of the five concrete bents and most of the west approach retaining walls and embankment. Hidden in the onsite staging yard, the integrated preconstruction mockup previews the final design details. Offsite, millions of dollars worth of steel and railings were fabricated and prepared for quick assembly on site, with the main span arriving just before the new year (which I&#8217;ll document next year). Construction is scheduled to wrap up by fall of 2025.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-1 wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221036206-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"687\" data-id=\"6746\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221036206-1024x687.jpg\" alt=\"\" class=\"wp-image-6746\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221036206-1024x687.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221036206-300x201.jpg 300w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Work begins on opposite sides of the roundabout, with formwork for concrete bent walls to the left and grading for the west approach to the right.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221253795-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6747\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221253795-1024x576.jpg\" alt=\"\" class=\"wp-image-6747\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221253795-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221253795-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221253795-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Between the roundabout and Sherwood High School, earthwork begins for the creation of terraced embankments for the west approach ramp.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_230753860-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6751\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_230753860-1024x576.jpg\" alt=\"\" class=\"wp-image-6751\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_230753860-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_230753860-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_230753860-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Excavation and fill begin to shape the footprint of the curved gabion walls for the west approach.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_223051801-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6750\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_223051801-1024x576.jpg\" alt=\"\" class=\"wp-image-6750\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_223051801-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_223051801-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_223051801-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The construction of bents 3 and 4 offers a first glimpse at the future on-bridge experience, up in the trees with excellent views to Sherwood High School.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221752711-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6748\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221752711-1024x576.jpg\" alt=\"\" class=\"wp-image-6748\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221752711-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221752711-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_221752711-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The view atop bent 4 to the 99W\/Sunset\/Elwert intersection overlooks the heavy traffic that future bridge users will bypass.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_222435981-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6749\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_222435981-1024x576.jpg\" alt=\"\" class=\"wp-image-6749\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_222435981-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_222435981-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240521_222435981-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Looking north from bent 4 along the utility lines that will be raised and undergrounded to create a safe clearance from the bridge deck.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-image alignfull size-full\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_210613774-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"847\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_210613774-scaled.jpg\" alt=\"\" class=\"wp-image-6752\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_210613774-scaled.jpg 2560w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_210613774-300x99.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_210613774-1024x339.jpg 1024w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><figcaption class=\"wp-element-caption\">Work continues on the west approach as the formwork is stripped to reveal the first concrete bent.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-1 wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233213536-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6753\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233213536-1024x576.jpg\" alt=\"\" class=\"wp-image-6753\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233213536-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233213536-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233213536-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The concrete bent walls feature a simple reveal pattern to break up the intentionally-monolithic massing when viewed more closely.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233254792-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6754\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233254792-1024x576.jpg\" alt=\"\" class=\"wp-image-6754\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233254792-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233254792-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233254792-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The concrete bents were envisioned as simple, raw concrete (as inspired brutalism); however, they will be finished smooth and painted per ODOT standards for ease of maintenance.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233335430.jpg\"><img decoding=\"async\" data-id=\"6755\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233335430.jpg\" alt=\"\" class=\"wp-image-6755\"\/><\/a><figcaption class=\"wp-element-caption\">Bent 3, the first to be completed, sits just east of Elwert Rd. and south of the roundabout.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233529057-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6756\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233529057-1024x576.jpg\" alt=\"\" class=\"wp-image-6756\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233529057-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233529057-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240611_233529057-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Cleared vegetation and formwork for bents 3 and 4 clarify the bridge path between Hwy 99W and Elwert Rd., with the eventual connection across the highway to the YMCA building.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-image alignfull size-full\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_213811046-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"735\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_213811046-scaled.jpg\" alt=\"\" class=\"wp-image-6757\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_213811046-scaled.jpg 2560w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_213811046-300x86.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_213811046-1024x294.jpg 1024w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><figcaption class=\"wp-element-caption\">By August 2024, bents 3, 4, and 5 were complete along with the lower gabion wall tier of the west approach embankment.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-1 wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_213933346-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"574\" data-id=\"6758\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_213933346-1024x574.jpg\" alt=\"\" class=\"wp-image-6758\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_213933346-1024x574.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_213933346-300x168.jpg 300w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">West approach embankment continues behind the completed gabion retaining walls.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_215003896-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6759\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_215003896-1024x576.jpg\" alt=\"\" class=\"wp-image-6759\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_215003896-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_215003896-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_215003896-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The final bents, 1 and 2, will be placed at the edges of the stormwater point following utility relocations. This could make them more accurately described as &#8220;piers&#8221;. They will be taller and wider than the others to make up the pond grade and the wider change in angle required to encircle the roundabout. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_215605220-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"6760\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_215605220-576x1024.jpg\" alt=\"\" class=\"wp-image-6760\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_215605220-576x1024.jpg 576w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_215605220-169x300.jpg 169w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_215605220-scaled.jpg 1440w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/><\/a><figcaption class=\"wp-element-caption\">Elevation view of the completed bent 3, finished in &#8220;Mt. St. Helens Gray&#8221;.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_220054256-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6761\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_220054256-1024x576.jpg\" alt=\"\" class=\"wp-image-6761\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_220054256-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_220054256-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240808_220054256-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Each bent features two trapezoidal, 28&#8243; thick concrete walls tapered at 5 degrees. The resulting void contrasts with the solid faces and will be lit with a colored &#8220;lantern&#8221; effect. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240905_180844910-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6764\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240905_180844910-1024x576.jpg\" alt=\"\" class=\"wp-image-6764\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240905_180844910-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240905_180844910-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240905_180844910-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The gabion walls at the base of the west approach feature decorative rock facing to blend the terraced embankment into the future landscape.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240905_180936600-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6765\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240905_180936600-1024x576.jpg\" alt=\"\" class=\"wp-image-6765\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240905_180936600-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240905_180936600-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240905_180936600-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Structural soil fill is compacted in layers to bring the west approach grade up to the concrete retaining wall foundations.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240830_190545959-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6763\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240830_190545959-1024x576.jpg\" alt=\"\" class=\"wp-image-6763\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240830_190545959-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240830_190545959-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240830_190545959-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Round HSS steel members are laid out in the fabrication shop for the first arch, the main span 5 over highway 99W.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240830_185151976-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6762\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240830_185151976-1024x576.jpg\" alt=\"\" class=\"wp-image-6762\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240830_185151976-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240830_185151976-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240830_185151976-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Sub-components are fabricated and laid out for welding in the shop. Rounded and angled steel plates will connect stainless steel rods and struts to the arches.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_172003681.jpg\"><img decoding=\"async\" data-id=\"6766\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_172003681.jpg\" alt=\"\" class=\"wp-image-6766\"\/><\/a><figcaption class=\"wp-element-caption\">Steel fabrications are prepared for elements across the project, including the east approach ramp columns, deck beams, and the deck edge fascia\/lighting trough. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_172103290-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6767\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_172103290-1024x576.jpg\" alt=\"\" class=\"wp-image-6767\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_172103290-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_172103290-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_172103290-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Complex steel shop assemblies form transitions from upturned channels to downturned beams and railing connections for the east approach landing.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_174953013-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"681\" data-id=\"6768\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_174953013-1024x681.jpg\" alt=\"\" class=\"wp-image-6768\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_174953013-1024x681.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_174953013-300x200.jpg 300w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Two of the steel &#8220;belvederes&#8221; are prepared for galvanizing. These features will be located between each bridge span and include a pole light to be mounted over the triangular brackets.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_181943500-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6771\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_181943500-1024x576.jpg\" alt=\"\" class=\"wp-image-6771\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_181943500-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_181943500-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_181943500-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Curved, 10&#8243; diameter round HSS cross bracing is fit up and cut to size in the fabrication shop, then will be welded together on site.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_181350278.jpg\"><img decoding=\"async\" data-id=\"6770\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_181350278.jpg\" alt=\"\" class=\"wp-image-6770\"\/><\/a><figcaption class=\"wp-element-caption\">The end connections from the arches to the deck are assembled in the shop in pairs.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_175729050-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6769\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_175729050-1024x576.jpg\" alt=\"\" class=\"wp-image-6769\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_175729050-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_175729050-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20240924_175729050-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The deck beams and chord are laid out in the fabrication shop for the 14ft wide by 194ft long main span 5 over highway 99W. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241104_163420821-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6795\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241104_163420821-1024x576.jpg\" alt=\"\" class=\"wp-image-6795\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241104_163420821-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241104_163420821-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241104_163420821-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">A completed steel &#8220;deck chord&#8221; assembly is prepared for painting in the shop. The assembly includes the structural round HSS arch tie, shaped connection plates for the truss tension rods (on alternate sides of the fascia), a flared fascia plate, the lighting trough, and vertical connections for the railing posts.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241104_165331765-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6796\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241104_165331765-1024x576.jpg\" alt=\"\" class=\"wp-image-6796\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241104_165331765-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241104_165331765-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241104_165331765-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Curved cross bracing and arch chords for span 5 over highway 99W are staged for painting.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-image alignfull size-full\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_165911149-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"988\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_165911149-scaled.jpg\" alt=\"\" class=\"wp-image-6772\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_165911149-scaled.jpg 2560w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_165911149-300x116.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_165911149-1024x395.jpg 1024w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/a><figcaption class=\"wp-element-caption\">West approach construction continues with formwork for the west abutment rising behind the gabion walls.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-1 wp-block-gallery-4 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_201738647-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6774\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_201738647-1024x576.jpg\" alt=\"\" class=\"wp-image-6774\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_201738647-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_201738647-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_201738647-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The integrated preconstruction mockup, located on site in the staging yard, features a wide range of project conditions condensed into a small space to validate workmanship, detailing, and integration between trades.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_192134371.jpg\"><img decoding=\"async\" data-id=\"6773\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241003_192134371.jpg\" alt=\"\" class=\"wp-image-6773\"\/><\/a><figcaption class=\"wp-element-caption\">The bridge deck will be illuminated through hundreds of small LED fixtures set into the stainless steel railings, seen here on the preconstruction mockup.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_131851546-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6776\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_131851546-1024x576.jpg\" alt=\"\" class=\"wp-image-6776\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_131851546-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_131851546-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_131851546-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The bridge deck lighting is tested on the preconstruction mockup, capturing half of the 14ft bridge width at the extended platform. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_132114733-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6777\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_132114733-1024x576.jpg\" alt=\"\" class=\"wp-image-6777\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_132114733-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_132114733-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_132114733-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Exterior of the preconstruction mockup with bridge deck lighting. The mockup was used to finalize the fixture orientation (tilted closer to the bridge deck, as is mockup up on the left section).<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_141314688-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6790\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_141314688-1024x576.jpg\" alt=\"\" class=\"wp-image-6790\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_141314688-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_141314688-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_141314688-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The mockup includes the unique stainless steel rod-supported cable mesh railing system and many of its details across the bridge and approaches.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_130650750.jpg\"><img decoding=\"async\" data-id=\"6775\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_130650750.jpg\" alt=\"\" class=\"wp-image-6775\"\/><\/a><figcaption class=\"wp-element-caption\">A single 4ft long color-changing light fixture is installed on the mockup to test the architectural lighting system integration with the design. The bridge will have a total of 214 of these fixtures, enabling countless lighting designs.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_132556682-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6788\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_132556682-1024x576.jpg\" alt=\"\" class=\"wp-image-6788\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_132556682-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_132556682-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_132556682-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The color-changing architectural fixtures recess into a hidden steel trough in the bridge curb, capped in stainless steel to match the railing system and reflect the light.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_135457806-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6789\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_135457806-1024x576.jpg\" alt=\"\" class=\"wp-image-6789\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_135457806-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_135457806-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_135457806-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Color-changing mockup lights illuminate a piece of sonotube, which was used to represent the design with uplights casting to the round arches above the deck.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175901190-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175901190-1024x576.jpg\" alt=\"\" class=\"wp-image-6806\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175901190-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175901190-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175901190-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The integrated preconstruction mockup will remain on site for reference until all relevant final work is installed.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-1 wp-block-gallery-5 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_144937164-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6791\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_144937164-1024x576.jpg\" alt=\"\" class=\"wp-image-6791\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_144937164-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_144937164-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_144937164-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Rebar is installed for the concrete retaining walls at the upper tier of the west approach, revealing the curved pathway.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_145418790-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6793\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_145418790-1024x576.jpg\" alt=\"\" class=\"wp-image-6793\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_145418790-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_145418790-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_145418790-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The last section of the west approach will be a void concrete box, being formed here, to reduce the height of the embankment.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_145852898-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6794\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_145852898-1024x576.jpg\" alt=\"\" class=\"wp-image-6794\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_145852898-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_145852898-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241016_145852898-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Construction of the two bents between the west abutment and bent 3 waits for utility relocations around the stormwater pond.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_165006985-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6797\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_165006985-1024x576.jpg\" alt=\"\" class=\"wp-image-6797\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_165006985-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_165006985-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_165006985-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The running track on the second level of the YMCA building overlooks the bridge alignment from completed bent 5 across the highway and onto Sherwood High School.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_171037224-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6798\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_171037224-1024x576.jpg\" alt=\"\" class=\"wp-image-6798\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_171037224-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_171037224-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_171037224-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Substructure work is complete on each side of the highway for installation of the main bridge span.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_171517379-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6799\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_171517379-1024x576.jpg\" alt=\"\" class=\"wp-image-6799\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_171517379-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_171517379-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_171517379-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">An at-grade view across the bridge alignment from bent 5 to bent 4, across highway 99W.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172332662-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6800\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172332662-1024x576.jpg\" alt=\"\" class=\"wp-image-6800\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172332662-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172332662-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172332662-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The east approach will include a slender elevated ramp structure to avoid blocking the YMCA building with fill.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172632070-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6801\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172632070-1024x576.jpg\" alt=\"\" class=\"wp-image-6801\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172632070-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172632070-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172632070-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The lawn in front of the YMCA building is graded to prepare for steel assembly and the eventual east approach ramp construction.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172901704-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6802\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172901704-1024x576.jpg\" alt=\"\" class=\"wp-image-6802\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172901704-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172901704-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_172901704-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The main span 5 over highway 99W will be fully assembled in the former YMCA lawn so that it can be lifted into place during a single weekend highway closure.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175452596-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6803\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175452596-1024x576.jpg\" alt=\"\" class=\"wp-image-6803\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175452596-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175452596-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175452596-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The concrete void box is completed at the west approach, and ready for its structural deck lid.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175629435-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6804\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175629435-1024x576.jpg\" alt=\"\" class=\"wp-image-6804\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175629435-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175629435-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175629435-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">West approach construction continues with formwork for the concrete retaining walls at the top of the embankment.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175712124-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6805\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175712124-1024x576.jpg\" alt=\"\" class=\"wp-image-6805\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175712124-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175712124-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241107_175712124-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Formwork is stripped at the west abutment to reveal the concrete formliner pattern that contrasts with the rock-faced gabion walls and rip rap at the stormwater facility.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_185704679-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6807\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_185704679-1024x576.jpg\" alt=\"\" class=\"wp-image-6807\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_185704679-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_185704679-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_185704679-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">A crane installs steel soldier piles to support excavation for bent 1 construction in the stormwater pond, as the west approach embankment nears completion.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_190724995-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6808\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_190724995-1024x576.jpg\" alt=\"\" class=\"wp-image-6808\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_190724995-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_190724995-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_190724995-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The concrete retaining walls atop the west approach embankment curve alternately to reflect the bridge elevation massing.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_190946104-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6809\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_190946104-1024x576.jpg\" alt=\"\" class=\"wp-image-6809\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_190946104-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_190946104-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_190946104-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Bridge span 1 will spring off of the completed west abutment and across Kruger Rd. This will be the last bridge span installed as onsite work shifts to the more compact east approach.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_191235331-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"6810\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_191235331-1024x768.jpg\" alt=\"\" class=\"wp-image-6810\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_191235331-1024x768.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_191235331-300x225.jpg 300w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Excavation shoring for bent 1 begins to fill the remaining gap in the bridge alignment and clarify its final footprint.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_192143136-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"6811\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_192143136-1024x576.jpg\" alt=\"\" class=\"wp-image-6811\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_192143136-1024x576.jpg 1024w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_192143136-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_192143136-1600x900.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">The west approach is graded up close to the final pathway alignment, climbing above the HS practice field to reach the bridge.<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<p><\/p>\n\n\n\n<aside class=\"wp-block-group alignwide has-light-gray-color has-black-background-color has-text-color has-background\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h1 class=\"wp-block-heading has-text-align-center\">Sherwood Hwy 99W Pedestrian Bridge Construction Series<\/h1>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-query is-layout-flow wp-block-query-is-layout-flow\"><ul class=\"wp-block-post-template is-layout-flow wp-block-post-template-is-layout-flow\"><li class=\"wp-block-post post-6712 post type-post status-publish format-gallery has-post-thumbnail hentry category-landscapes tag-kpff tag-sherwood post_format-post-format-gallery\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2024\/03\/sherwood-hwy-99w-pedestrian-bridge-preconstruction\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20220421_184108183-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Sherwood Hwy 99W Pedestrian Bridge &#8211; Preconstruction\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20220421_184108183-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20220421_184108183-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20220421_184108183-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2024\/03\/sherwood-hwy-99w-pedestrian-bridge-preconstruction\/\" target=\"_self\" >Sherwood Hwy 99W Pedestrian Bridge &#8211; Preconstruction<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2024-03-30T14:05:50-07:00\">March 30, 2024<\/time><\/div><\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-6744 post type-post status-publish format-gallery has-post-thumbnail hentry category-construction tag-bridge tag-kpff tag-sherwood post_format-post-format-gallery\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2024\/12\/sherwood-highway-99w-pedestrian-bridge-construction-2024\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_185704679-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Sherwood Highway 99W Pedestrian Bridge Construction, 2024\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_185704679-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_185704679-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2024\/12\/PXL_20241219_185704679-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2024\/12\/sherwood-highway-99w-pedestrian-bridge-construction-2024\/\" target=\"_self\" >Sherwood Highway 99W Pedestrian Bridge Construction, 2024<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2024-12-31T17:13:00-08:00\">December 31, 2024<\/time><\/div><\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-6828 post type-post status-publish format-standard has-post-thumbnail hentry category-construction tag-bridge tag-kpff tag-sherwood\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2025\/05\/sherwood-highway-99w-pedestrian-bridge-span-erection\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/05\/PXL_20250517_164452209-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Sherwood Highway 99W Pedestrian Bridge Span Erection\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/05\/PXL_20250517_164452209-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/05\/PXL_20250517_164452209-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/05\/PXL_20250517_164452209-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2025\/05\/sherwood-highway-99w-pedestrian-bridge-span-erection\/\" target=\"_self\" >Sherwood Highway 99W Pedestrian Bridge Span Erection<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2025-05-24T10:13:06-07:00\">May 24, 2025<\/time><\/div><\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-7472 post type-post status-publish format-gallery has-post-thumbnail hentry category-construction tag-bridge tag-kpff tag-sherwood post_format-post-format-gallery\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2025\/10\/sherwood-highway-99w-pedestrian-bridge-construction-2025\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/10\/PXL_20250626_212810149-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Sherwood Highway 99W Pedestrian Bridge Construction, 2025\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/10\/PXL_20250626_212810149-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/10\/PXL_20250626_212810149-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/10\/PXL_20250626_212810149-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2025\/10\/sherwood-highway-99w-pedestrian-bridge-construction-2025\/\" target=\"_self\" >Sherwood Highway 99W Pedestrian Bridge Construction, 2025<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2025-10-12T14:43:31-07:00\">October 12, 2025<\/time><\/div><\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-7766 post type-post status-publish format-gallery has-post-thumbnail hentry category-architecture tag-bridge tag-colored-light tag-kpff tag-sherwood post_format-post-format-gallery\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2025\/10\/sherwood-hwy-99w-pedestrian-bridge-at-night\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/10\/PXL_20250923_053452831-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Sherwood Hwy 99W Pedestrian Bridge at Night\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/10\/PXL_20250923_053452831-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/10\/PXL_20250923_053452831-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/10\/PXL_20250923_053452831-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2025\/10\/sherwood-hwy-99w-pedestrian-bridge-at-night\/\" target=\"_self\" >Sherwood Hwy 99W Pedestrian Bridge at Night<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2025-10-12T20:06:26-07:00\">October 12, 2025<\/time><\/div><\/div>\n<\/div>\n\n<\/li><li class=\"wp-block-post post-7893 post type-post status-publish format-gallery has-post-thumbnail hentry category-architecture category-landscape-architecture tag-bridge tag-colored-light tag-kpff tag-sherwood post_format-post-format-gallery\">\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\"><figure class=\"fsg-exclude wp-block-post-featured-image\"><a href=\"https:\/\/celloexpressions.com\/photography\/2025\/12\/sherwood-hwy-99w-pedestrian-bridge-fall-2025\/\" target=\"_self\"  ><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/12\/PXL_20251211_010418992-1600x900.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Sherwood Hwy 99W Pedestrian Bridge, Fall 2025\" style=\"object-fit:cover;\" srcset=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/12\/PXL_20251211_010418992-1600x900.jpg 1600w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/12\/PXL_20251211_010418992-300x169.jpg 300w, https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/12\/PXL_20251211_010418992-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:67%\"><h2 class=\"wp-block-post-title\"><a href=\"https:\/\/celloexpressions.com\/photography\/2025\/12\/sherwood-hwy-99w-pedestrian-bridge-fall-2025\/\" target=\"_self\" >Sherwood Hwy 99W Pedestrian Bridge, Fall 2025<\/a><\/h2>\n\n<div class=\"wp-block-post-date\"><time datetime=\"2025-12-28T11:44:09-08:00\">December 28, 2025<\/time><\/div><\/div>\n<\/div>\n\n<\/li><\/ul><\/div>\n\n\n\n<div style=\"height:24px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/aside>\n","protected":false},"excerpt":{"rendered":"<p>After <a href=\"https:\/\/celloexpressions.com\/photography\/2025\/10\/sherwood-highway-99w-pedestrian-bridge-construction-2025\/\">construction wrapped up this summer<\/a>, Sherwood&#8217;s new pedestrian bridge opened for use on the first day of school in August. The community came together for a grand opening celebration at the end of September. Several hundred locals now cross the bridge daily, including a steady stream of dogs and the occasional bike. This gallery features additional views around the completed project as punchlist work continued through the fall.<\/p>\n<p> <a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/12\/PXL_20250826_002900388-scaled.jpg\"><\/a>The main bridge span crosses over the 42,000 average daily vehicles on Highway 99W. <a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/12\/PXL_20250918_152526686-scaled.jpg\"><\/a>Students head across the bridge on foot and on bike to Sherwood High School. <a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/12\/PXL_20250918_155632216-scaled.jpg\"><\/a>The curved belvedere railings between each span reference the arched form of the bridge trusses. <a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/12\/PXL_20250918_155932962-scaled.jpg\"><\/a>Looking across the bridge to the west, its gentle curve to the north is evident. <a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/12\/PXL_20250918_161421347-scaled.jpg\"><\/a>The shadow of the span 5 north arch leaps across the bridge deck over the highway. <a href=\"https:\/\/celloexpressions.com\/photography\/wp-content\/uploads\/sites\/4\/2025\/12\/PXL_20250918_161745140-scaled.jpg\"><\/a>Diagonal cross bracing between the arches creates an expansive sense&hellip;<\/p>\n<div><a class=\"excerpt-more button\" href=\"https:\/\/celloexpressions.com\/photography\/2024\/12\/sherwood-highway-99w-pedestrian-bridge-construction-2024\/\">Read more <span class=\"screen-reader-text\">Sherwood Highway 99W Pedestrian Bridge Construction, 2024 <\/span><span class=\"meta-nav\" aria-hidden=\"true\"> &rarr;<\/span><\/a><\/div>\n","protected":false},"author":1,"featured_media":6807,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[6],"tags":[37,34,50],"class_list":["post-6744","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-construction","tag-bridge","tag-kpff","tag-sherwood","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/6744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/comments?post=6744"}],"version-history":[{"count":5,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/6744\/revisions"}],"predecessor-version":[{"id":6822,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts\/6744\/revisions\/6822"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/media\/6807"}],"wp:attachment":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/media?parent=6744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/categories?post=6744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/tags?post=6744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}