{"id":10,"count":32,"description":"These posts document the construction of the USC Village development project. I worked for the General Contractor, Hathaway Dinwiddie, for the initial 1.1 million square foot build-out of the site, between May 2015 and December 2016. We built buildings 1 (UVO), 4 (MHC), 6 (CIC), 7 (MRC), 8 (NBC), and 9 (CRC), along with the site development. The photos within these galleries include extensive insights on the progress and plans for the development as it was built. Additional, current information at <a href=\"http:\/\/village.usc.edu\/\">http:\/\/village.usc.edu<\/a>.","link":"https:\/\/celloexpressions.com\/photography\/tag\/usc-village\/","name":"USC Village","slug":"usc-village","taxonomy":"post_tag","meta":[],"_links":{"self":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/tags\/10","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/tags"}],"about":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/taxonomies\/post_tag"}],"wp:post_type":[{"href":"https:\/\/celloexpressions.com\/photography\/wp-json\/wp\/v2\/posts?tags=10"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}