Our geotech team had a pretty successful competition, with their wall holding through all but one loading test.
Drawing out the reinforcement scheme. Measurements for reinforcement placement. Build team ready to go. Team huddle. Measuring & cutting reinforcing strips. Measuring reinforcing paper. Measuring reinforcing paper. Loading the box & building the wall. Sand, ready to be loaded into the wall. Packing the sand in. Loading sand into the box. Build complete! Applying the external loads. The wall’s holding! “Let’s do this”