All of our design teams are busy making final preparations for PSWC 2016. With less than a week before conference, the KAP basement is full of activity from everyone from steel bridge working on final fabrication and assembly, concrete canoe preparing the stands, section, and display table, geotech building their box, surveying practicing, and environmental finishing their system. We’re excited to showcase our work in Long Beach next week!