Final Prep for PSWC 2016

All of our design teams are busy making final preparations for PSWC 2016. With less than a week before conference, the KAP basement is full of activity from everyone from steel bridge working on final fabrication and assembly, concrete canoe preparing the stands, section, and display table, geotech building their box, surveying practicing, and environmental finishing their system. We’re excited to showcase our work in Long Beach next week!

The environmental team work on their filtering system.
The environmental team works on their filtering system.
The concrete canoe team tests out their new, reusable folding wood canoe stands.
The concrete canoe team tests out their new, reusable folding wood canoe stands.
Geotech captain Marissa measures the geowall box.
Geotech captain Marissa measures the geowall box.
Steel bridge team members discuss how to manufacture a part.
Steel bridge team members discuss how to manufacture a part.
Steel bridge members at work.
Steel bridge members at work.
The steel bridge box where pieces are transported.
The steel bridge box where pieces are transported.
The steel bridge team takes a brief break to pose for a photo.
The steel bridge team takes a brief break to pose for a photo.
Pieces of the Steel Bridge are laid out.
Pieces of the Steel Bridge are laid out.
Surveying team members practice in E-Quad.
Surveying team members practice in E-Quad.