Concrete Canoe 2013 Canoe Prep: Mold & Reinforcement Gallery March 1, 2013 Nick Halsey Finishing up the mold and preparing the reinforcement the night before pour day: The mold after the second stage of sanding.We eventually realized that the mold glue bonded best vertically.Waiting for glue to dry so we can tape the bigger mold chunks together… the cinder blocks help apply pressure to bond the moldArranging the mold into pour-positionThe positioned canoe mold is taped togetherWe needed to do some final sanding to account for the adjustments from the mold block positioning changes after gluingLaying out reinforcementWe went with two layers of reinforcement, three layers of concrete this timeOne layer is positioned the long way in two big overlayed strips, the other in seven smaller strips across X Exit full screen gallery ⇗ Open full size image → Next image 0 of 0 ← Previous image