Finishing up the mold and preparing the reinforcement the night before pour day:

The mold after the second stage of sanding. 


We eventually realized that the mold glue bonded best vertically. 
Waiting for glue to dry so we can tape the bigger mold chunks together… the cinder blocks help apply pressure to bond the mold 

Arranging the mold into pour-position 




The positioned canoe mold is taped together 
We needed to do some final sanding to account for the adjustments from the mold block positioning changes after gluing 
Laying out reinforcement 
We went with two layers of reinforcement, three layers of concrete this time 
One layer is positioned the long way in two big overlayed strips, the other in seven smaller strips across