Building 1’s structural steel is now erected, and facade panels continue to go up on Building 4, where the dining hall is also taking shape and the roof is complete.
Structural steel is almost complete at Building 1.
Metal decking is installed on the Building 1 roof.
The corners of Building 1 will be open to the sky.
CMU elevator shaft to the parking levels at Building 9.
Building 8 is formed through level 2.
Excavation of the sidewalk at the new ramp to the underground parking.
Buildings 7 & 8.
Gap between the north and south sections of Building 8, which will have a breezeway at the first floor.
Building 7 level 2 slab.
View of the plaza and beyond at Hoover & Jefferson from Building 7 level 2.
The last section of Building 8 level 2 is formed.
Across the street, the Kauffman Dance Center continues rising.
Paseo between Buildings 7 & 8.
First facade panels on the 3rd and 4th level of Building 4. These are more typical of the rest of the buildings.
View out the intricate 2nd-level windows on Building 4.
Buildings 9 & 1.
Building 4 upper courtyard.
Residential bedroom in Building 4.
Building 4 dining hall wall forming has gone up, enclosing the courtyard.
Buildings 6, 7, & 8 from the Building 4 roof.
Building 9 parking pavilion from the Building 4 roof.
View across Building 9 to downtown from the Building 4 roof.
Looking across the Building 4 upper courtyard at the roof.
4-story-tall wall formwork for the dining hall at Building 4.
Precast arch panels in the Building 4 residential lobby.
Precast arches at the Building 4 bike storage room.
A single precast arch panel.
Building 1 south side.
Round rebar cages have gone up for the pavilion roof framing.
Building 6 level 2.
Building 6 courtyard.
Kauffman dance center from Building 6.
The old Fire Station No. 15 has emerged from its asbestos-paint-removing tent and is now being cut into sections and prepared to be moved.
Central Plaza from Building 6 level 2.
Precast facade panels on Building 4 from Building 6 level 2.
Precast arches on Building 4.
Precast arches at the residential lobby entrance.
The Building 4 south facade is beginning to fill in.
Old Fire Station No. 15 from across Jefferson Boulevard.
Building 6 level 4 is being formed up.
Rebar cages at Building 9’s parking pavilion.
Tower cranes from the corner of the site on Building 7 level 2.
Crews install additional precast facade panels.
Building 4 dining hall is emerging.
Tower crane #1 at Building 4.
Columns are poured and the North wall is next in the dining hall.
MEP in the interstitial space above level 1 in Building 4.
The stairs have been installed in Building 4.
Building 4 level 2 corridor.
A less intricate level 2 window at Building 4.
View of Building 6 through the tracery on a window on Building 4.
Residential bathroom in Building 4.
Another staircase is ready for its concrete treads to be poured in Building 4.
Rebar for equipment pads on the Building 4 roof.
Foam in an equipment pad at Building 4.
Building 4 upper courtyard.
Building 9 from the Building 4 roof.
Building 9 parking pavilion from the Building 4 roof.
Buildings 7 & 8 from the Building 4 roof.
Buildings 6 & 7 from the Building 4 roof.
Tower base on the Building 4 roof.
Anchor bolts for steel mansard roof framing on Building 4.
Building 8 lower courtyard from the roof.
Building 4 dining hall from the roof.
Building 4 low roof parapet detail.
Anchor bolts and other metals are in place for the Building 4 low roof.
Formwork for the Building 4 roof.
Building 9 from the plaza.