Cello Expressions

  • Cello Expressions Digital Projects
  • Abstracted cello icon Sheet Music Library
  • Truss bridge icon Photography
  • Infinity icon Blog
  • Soil hatch pattern Food
  • Nested half-infinity icon WordPress Plugins
  • Rhombus star icon WordPress Themes
  • Deconstructed infinity icon Pseudo-Random Experiments
  • Triple-nested offset angle icon Interactive Geometry Apps
  • Savonuis top view icon Geometry of the Twisted Savonius Wind Turbine
  • About
  • Contact
  • Privacy Policy
  • USC ASCE Archive
  • A Concert for Kati Archive
  • © 2026 Nick Halsey
Skip to content

Cello Expressions Photography

  • Architecture
  • Construction
    • USC Village (2015 – 2017)
    • 5 MLK (2017 – 2020)
    • Block 216 (2019 – 2023)
    • Sherwood (2022-2025)
  • Nature
    • Garden
    • Textures
  • Landscapes

Tag: USC Village

These posts document the construction of the USC Village development project. I worked for the General Contractor, Hathaway Dinwiddie, for the initial 1.1 million square foot build-out of the site, between May 2015 and December 2016. We built buildings 1 (UVO), 4 (MHC), 6 (CIC), 7 (MRC), 8 (NBC), and 9 (CRC), along with the site development. The photos within these galleries include extensive insights on the progress and plans for the development as it was built. Additional, current information at http://village.usc.edu.

USC Village Construction – Week of 9-7-2015

  • See more USC Village Construction – Week of 9-7-2015 →

USC Village Construction – Week of 9/14/2015

  • See more USC Village Construction – Week of 9/14/2015 →

Official USC Village Construction Video –  September 2015

Utility work continues in the central plaza.

USC Village Construction – Week of 9/21/2015

  • See more USC Village Construction – Week of 9/21/2015 →

USC Village Construction – Week of 9/28/2015

  • See more USC Village Construction – Week of 9/28/2015 →

USC Village Construction – October 2015

  • See more USC Village Construction – October 2015 →

USC Village Construction – November 2015

  • See more USC Village Construction – November 2015 →

USC Village Drone Flyover December 2015

Building 1 facade facing the central plaza.

 

USC Village Construction – December 2015

  • See more USC Village Construction – December 2015 →

USC Village Construction – January 2016

  • See more USC Village Construction – January 2016 →

USC Village Construction – February 2016

  • See more USC Village Construction – February 2016 →

USC Village Construction – March 2016

  • See more USC Village Construction – March 2016 →

Posts navigation

← Older posts
Newer posts →
P2 level under Building 9, which will hold 230 cars.
Shadow of the mobile crane over the newly-installed facade of Building 4.
Copper water lines in Building 6 on level 1.
Row of single arch windows at Building 4 level 5.
View down Watt Way, now open across Jefferson Boulevard to the main USC campus, from Building 9 level 2.
View of the Building 4 clock tower from the Building 8 south courtyard.
Building 4 roof penthouses and clock tower.
The clock tower’s triple arch and rose panel. This is one of the most intricate pieces of precast on the project. The tower spire is visible beyond the panel.
Fluid-applied waterproofing is applied to a shear wall on Building 6, where the brick facade will be hand-set.
Buildings 4 & 9, on a day with an impeccable sky.

Categories

  • Architecture (37)
  • Construction (49)
  • Landscape Architecture (19)
  • Landscapes (28)
  • Nature (39)
  • Textures (15)
  • About
  • Contact
© 2026 Nick Halsey | Theme: Arbutus by Nick Halsey.