Cello Expressions

  • Cello Expressions Digital Projects
  • Abstracted cello icon Sheet Music Library
  • Truss bridge icon Photography
  • Infinity icon Blog
  • Soil hatch pattern Food
  • Nested half-infinity icon WordPress Plugins
  • Rhombus star icon WordPress Themes
  • Deconstructed infinity icon Pseudo-Random Experiments
  • Triple-nested offset angle icon Interactive Geometry Apps
  • Savonuis top view icon Geometry of the Twisted Savonius Wind Turbine
  • About
  • Contact
  • Privacy Policy
  • USC ASCE Archive
  • A Concert for Kati Archive
  • © 2025 Nick Halsey
Skip to content

Cello Expressions Photography

  • Architecture
  • Construction
    • USC Village (2015 – 2017)
    • 5 MLK (2017 – 2020)
    • Block 216 (2019 – 2023)
    • Sherwood (2022-2025)
  • Landscapes
    • Nature
    • Garden
  • Textures

Tag: USC Village

These posts document the construction of the USC Village development project. I worked for the General Contractor, Hathaway Dinwiddie, for the initial 1.1 million square foot build-out of the site, between May 2015 and December 2016. We built buildings 1 (UVO), 4 (MHC), 6 (CIC), 7 (MRC), 8 (NBC), and 9 (CRC), along with the site development. The photos within these galleries include extensive insights on the progress and plans for the development as it was built. Additional, current information at http://village.usc.edu.

USC Village, August 2017

  • See more USC Village, August 2017 →

USC Village Construction – December 2016

  • See more USC Village Construction – December 2016 →

USC Village Construction – November 2016

  • See more USC Village Construction – November 2016 →

USC Village Construction – October 2016

  • See more USC Village Construction – October 2016 →

USC Village Construction – September 2016

  • See more USC Village Construction – September 2016 →

USC Village Construction – August 2016

  • See more USC Village Construction – August 2016 →

USC Village Construction – May 2016

  • See more USC Village Construction – May 2016 →

USC Village Construction – April 2016

  • See more USC Village Construction – April 2016 →

USC Village Construction – March 2016

  • See more USC Village Construction – March 2016 →

USC Village Construction – February 2016

  • See more USC Village Construction – February 2016 →

USC Village Construction – January 2016

  • See more USC Village Construction – January 2016 →

USC Village Construction – December 2015

  • See more USC Village Construction – December 2015 →

Posts navigation

← Older posts
Clock tower and the Hecuba statue.
Building 8 reflects in the central plaza fountain, which is filled with rainwater from a recent storm.
Completed concrete paving west of Building 9 near the bridge.
Looking down a walkway through the Building 9 north courtyard.
Building 8 south courtyard trellis, with the newly-completed handset brick facade over the shear wall.
Central plaza with a view to the completed Building 4 clock tower.
View from the bridge at level 3.
Building 4 dining hall, with its roof framing nearly complete.
Buildings 4 & 9, on a day with an impeccable sky.
Fluid-applied waterproofing is applied to a shear wall on Building 6, where the brick facade will be hand-set.
The clock tower’s triple arch and rose panel. This is one of the most intricate pieces of precast on the project. The tower spire is visible beyond the panel.
Building 4 roof penthouses and clock tower.

Categories

  • Architecture (30)
  • Construction (47)
  • Landscape Architecture (16)
  • Landscapes (25)
  • Nature (38)
  • Textures (15)
  • About
  • Contact
© 2025 Nick Halsey | Theme: Arbutus by Nick Halsey.